From installation to handover, one check at a time.
The Commissioning view summarises the state of the work: how many cables are installed, terminated and tested, and where each device stands, from planned to passed.


Cable status
The summary counts installed, terminated and tested cables, with test results. A cable whose sections are in different states is not counted as installed until all of them are, so the figure reflects work that is actually complete.
Device status
Each device has a commissioning status: planned, installed, connected, configured, tested, passed, or with an issue to resolve. Filter by category and status to find what is still missing before handover.
A document for handover
Print the commissioning summary or export it to PDF with the same title block as the other drawings; it can also be included when printing the whole project.
In the same project
Commissioning does not keep a second list: it reads installation, termination and test status from the same cable schedule, and device status from the project. Update a cable in the Cable Schedule and the summary changes with it.