From installation to handover, one check at a time.
The Commissioning view summarises the state of the work: how many cables are installed, terminated and tested, and where each device stands, from planned to passed.
Cable status
The summary counts installed, terminated and tested cables, with test results. A cable whose sections are in different states is not counted as installed until all of them are.
Device status
Each device has a commissioning status: planned, installed, connected, configured, tested, passed, or with an issue to resolve. Search by name, code or category to find what is still missing before handover.
A document for handover
Print the commissioning summary or export it to PDF with the same title block as the other drawings.
In the same project
Commissioning does not keep a second list: it reads installation, termination and test status from the same cable schedule, and device status from the project. Update a cable in the Cable Schedule and the summary changes with it.